News

FG announces two-week closure of First Niger Bridge for emergency repairs

The Federal Government has announced that the First Niger Bridge in Onitsha, Anambra State, will be temporarily closed for two weeks to allow emergency repair and rehabilitation works to be carried out.

According to the Federal Ministry of Works, the closure will begin on Monday, September 7, 2026, and is expected to remain in place until Monday, September 21, 2026.

The announcement follows a recent inspection of the bridge by the Minister of Works, David Umahi, who raised concerns about its deteriorating condition and damage caused by vandalism.

During the inspection, it was discovered that some bridge components, including bolts, nuts, iron fittings and parts of the expansion joint steelworks, had allegedly been stolen or damaged by vandals.

In a statement signed by the Anambra State Controller of Works, Timothy Emenike, the ministry said emergency intervention was necessary to restore the bridge to a safe and motorable condition.

Contractor SKECC has been directed to begin the repair works immediately.

The rehabilitation will include the removal of deteriorated asphalt, resurfacing with approximately 40mm of asphalt wearing course, repairs to affected bridge components and other safety-related works.

The government also plans to install solar-powered streetlights and CCTV cameras on the bridge to improve security and help monitor vandalism.

During the closure, motorists travelling through the area have been advised to use the Second Niger Bridge via Obosi towards Asaba, Delta State, and other destinations.

Traffic diversion signs, safety barriers and traffic-control personnel will be deployed to assist motorists throughout the repair period.

Road users have also been urged to reduce their speed, obey temporary traffic signs and avoid dangerous overtaking around diversion and construction zones.

The ministry said work would continue day and night to ensure the repairs are completed as quickly as possible.

It apologised to motorists, businesses and residents for the inconvenience, saying the temporary closure is necessary to strengthen the bridge and improve the safety of road users.

You may also like...

Leave a Reply

Your email address will not be published. Required fields are marked *